The guys have finished as far as they can go until the weather and land dries up enough to do the decks. We have to contact some people about gutters as the rain splashes dirt on our pre-painted siding.
We will be getting sand delivered to spread on the floor of the garage prior to cement covering being done.
They built the pony wall for the back of the kitchen counters between the kitchen and dining room and it sure brought form into the wide open space of the first floor.
The plumber will come on Monday and install the bathtubs and an exterior hose bib in the front. We were going to have a hot/cold outside tap for washing cars but the placement needed is not available so we are just doing a regular cold tap.